The line graph compares how much time it would take for three companies to manufacture a refrigerator in 1990 and 2000. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.
Write at least 150 words.
The chart presents the length of time that three companies took to produce a refrigerator in 1990 and 2000.
Overall, the refrigerator manufacturing time for all the given companies sped up after a decade, with Company A able to manufacture fridges significantly faster than the other two.
Among the businesses, Company A eventually had the fastest manufacturing time, though it was not the case at the beginning. In 1990, it took 30 hours for Company A to produce a fridge. But ten years later, their production time was reduced to approximately 22 hours, considerably lower than the two other companies.
Company B had the second fastest production time at the end of the period, though the improvement was marginal. In 1990, it took them around 27 hours to build a refrigerator, and the time declined to roughly 26 hours in 2000. On the other hand, Company C had the longest manufacturing time in 1990, taking 35 hours to manufacture a single fridge. The manufacturing upgrade, however, mirrored that of Company A as there was a marked improvement in Company C’s production time, falling to just 28 hours to make a fridge in 2000. Yet, it was still the slowest among the three.